Feasibility Study
Conservation Appraisal for Lismore Parish Church
The Feasibility Study and Business plan were funded jointly by the Architectural Heritage Fund and the National Lottery Herirage Fund.
Lismore Church Feasibility Study
Building condition repair works
Appendix ii - Context and market appraisal
Appendix iii - Existing Drawings
Latest Reports 2025
These studies were supported by a Stage 2 Grant of £7,964 from the Architectural Heritage Fund (AHF) to whom the community is deeply grateful.
3 January / February 2025 - Reports to Kilmoluag Liosmor:
3.1 Valuation reports: Morham and Brotchie, Oban. Tom McQuade
3.2 Water supply: Highwater, Stirling. Greg Vears
3.3 Drainage: Arthian (prev Mabbett), Glasgow. Dave Clark
3.4 Archaeological oversight: Argyll Archaeology, Dr Clare Ellis
Back to Church Future main page